Skip to content
VCS SouthwestRequest a quote

Hospitals · A PRACTICAL PLANNING GUIDE

Coldroom hire for hospital catering

Hospital catering has to keep moving while kitchens and refrigeration are being maintained or replaced. A temporary coldroom plan should start with meal production, delivery routines and the people coordinating the site, so the changeover is manageable for catering and estates teams.

Create your project

Explore a layout and send us your requirements.

Hospital catering meal trays and delivery trolleys in a large kitchen
AI-generated sector illustration.

Coordinate catering and estates

Protect routine delivery routes

Allow time for the stock changeover

PLAN 01

Define the catering requirement first

Identify what the temporary storage is replacing. Is it a single kitchen fridge, several stores during refurbishment or extra capacity for a planned period? List the peak quantity of chilled and frozen catering stock, delivery frequency and the teams needing access. Those details are more useful than the number of meals alone.

This page concerns food storage for hospital catering. Medicines, vaccines, blood and laboratory materials have different requirements and are not the intended application described here. Keep the enquiry specific about the goods, operating conditions and intended handling routine.

PLAN 02

Bring the right site teams into the plan

Catering staff understand stock movement; estates and facilities teams know the building, services and contractor requirements. Agree a lead contact who can coordinate location, access, power and handover. Include any local induction, permit or delivery booking requirements when arranging the hire.

Check how installation work will fit around kitchen deliveries and other site activity. An available space may also be a service route or needed by another contractor. Confirm the area can remain available for the entire hire, with access for maintenance and eventual collection.

PLAN 03

Make the route practical for regular use

Walk the proposed route with the team that will use it. Think about trolley dimensions, door openings, gradients, thresholds and the frequency of trips. Storage that is technically nearby may still create awkward daily handling if staff have to negotiate tight turns or busy corridors.

Modular construction can help where a complete assembled unit cannot reach the location. We still need the dimensions and photographs of the route to assess component access. For an outdoor position, discuss ground support and staff movement between the room and catering area, as well as ventilation space around the equipment.

PLAN 04

Schedule a controlled changeover

Work backwards from the date permanent refrigeration becomes unavailable. Agree installation and power readiness early enough to bring the temporary room to its operating temperature and complete your own checks before transferring catering stock. Avoid planning the stock transfer for the same moment the build is due to finish.

Continue the kitchen’s established stock separation, cleaning and monitoring procedures during the temporary arrangement. Allocate responsibility for routine checks and reporting problems. At the end of the hire, confirm the permanent store is ready and stock is removed before scheduling dismantling; discuss changes to the programme as soon as they are known.

FROM REAL INSTALLATIONS

See an indoor and outdoor catering installation

The Grange Park Opera project shows how rooms can be planned around different catering spaces. It is an installation example from another sector.

Explore the project examples →

BEFORE YOU ENQUIRE

What to include in your project

You do not need every detail settled. Start with what you know and include any questions about the site or layout.

  • Catering-only storage requirement and chilled/frozen split
  • Kitchen and estates contacts plus delivery booking process
  • Proposed location and trolley route measurements
  • Site induction, access and contractor arrangements
  • Power readiness, stock transfer dates and collection plan
Open the project designer →

COMMON QUESTIONS

Hospitals coldroom hire: your questions

Is this service for medical or pharmaceutical storage?

The application described here is hospital catering food storage. Do not assume these rooms meet requirements for medicines, vaccines or clinical materials.

Can a room be installed indoors?

Potentially, subject to access, available space, ventilation and power assessment. Send the full route and proposed location, not just the dimensions of the final space.

Can hire cover a refurbishment that changes dates?

Tell us the expected programme and any uncertainty when enquiring. If it changes, contact us promptly to discuss availability and revised arrangements; extensions are not automatic.

TURN THE PLAN INTO A PROJECT

Start with your space.
We’ll help with the details.

Choose a room layout, add your dates and tell us how you plan to use it. The team will review the practical requirements with you before the hire is confirmed.

Create your project →Or ask the team a question